Hi All,
I have installed ECC 6.0 in windows/sql environment. I have to perform a system copy from production to this newly installed system. Before performing system copy do I have to install all support packs and add-on components similar to the production system? Do I have to create clients as well similar to production? Please advise. Is there any other post installation step needed before copying from production? The goal is to create a system similar to production system.
Thanks,
Kavitha Rajan.