Hi All,
We have ECC 6.0(QA) system installed. DB server, CI server and App server. These are physical servers and future plan is to migrate to VM. But my current issue is I do not have space in Application drive in this CI physical server. Most of the time reduce global folder and manage. Planning to move to VM temporarily ONLY for the CI to perform stack upgrade. What will be the procedure? Do I have to install CI on this new VM? Looking for a easy proposal. Please advise ASAP. DB is SQL 2005.
Thanks,
Kavitha.